2015年8月14日星期五

Test running note of Scraper conveyor (II)

This article is the continuation of previous one. PK Machinery will introduce you load testing running of scraper conveyor.

Load test running 

1. Once no-load test running becomes normal , please test run with load.
2. After scraper conveyor runs with load normally, please feed the material uniformly to avoid blockage.


complete picture of scraper

3. The casing must be fully sealed to avoid the material overflowing. A grate net must be added on the inlet to avoid massive material or hard objects enter into the scraper conveyor. 
4. After material inside the scraper conveyor is discharged from the outlet completely, then stop the machine. 
5. During no-load and load test running, please make a record that includes voltage, current, power and scraper chain running speed etc. and check whether they meet the requirement of design or not. 

horizontal scraper chain conveyor2

-------------------------------------------------------------------------------------------------------------------------------------------
Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. Our goal is "be the future global leader of mining machinery industry". Have any questions, please contact us without any hesitation.

没有评论:

发表评论